Deerwood, MN - Foundation

Heat tubes installed in footing to properly cure concrete in cold January temperatures.
Good representation of the elevation change from existing grade to bottom of foundation. The house is getting built into the side of a steep hill on shore of Portage Lake.

Wall Phase 1/3 Set Up

Wall Phase 1/3 Ready To Pour

Wall Phase 2/3 Set Up
Wall Phase 2/3 Stripped